Short Lead Time for Dual Fuel Generators - P625E6A-60HZ – AGG Power - AGG Power Technology (UK) CO., LTD.

Short Lead Time for Dual Fuel Generators - P625E6A-60HZ – AGG Power

Diesel Generator set |

SPECIFICATIONS

Related Video

Feedback (2)

abide by the contract", conforms to the market requirement, joins in the market competition by its high quality as well as provides more comprehensive and excellent service for clients to let them become big winner. The pursue of the company, is the clients' satisfaction for Portable Diesel Welding Generator, Air Cooled Generator, Generators Diesel Silent, We have been one of your largest 100% manufacturers in China. A lot of large trading businesses import products and solutions from us, so we can easily give you the most beneficial price tag with the same quality for anyone who is interested in us.
Short Lead Time for Dual Fuel Generators - P625E6A-60HZ – AGG Power Detail:

GENERATOR SET SPECIFICATIONS

Standby Power (kVA/kW):625/500

Prime Power (kVA/kW):563/450

Frequency: 60Hz

Speed:1800 rpm

 

ENGINE

Powered by: Perkins

Engine Model: 2506C-E15TAG4

 

ALTERNATOR

High Efficiency

IP23 Protection

 

SOUND ATTENUATED ENCLOSURE

Manual/Autostart Control Panel

DC And AC Wiring Harnesses

 

SOUND ATTENUATED ENCLOSURE

Fully Weatherproof Sound Attenuated Enclosure With Internal Exhaust Silencer

Highly Corrosion Resistant Construction

 


Related Product Guide:
Cooperation

We believe in: Innovation is our soul and spirit. Quality is our life. Shopper need is our God for Short Lead Time for Dual Fuel Generators - P625E6A-60HZ – AGG Power , The product will supply to all over the world, such as: Auckland, Tunisia, Oman, Our business activities and processes are engineered to make sure our customers have access to widest range of products with the shortest supply time lines. This achievement is made possible by our highly skilled and experienced team. We look for people who want to grow with us around the globe and stand out from the crowd. We have people who embrace tomorrow, have vision, love stretching their minds and going far beyond what they thought was achievable.

The sales person is professional and responsible, warm and polite, we had a pleasant conversation and no language barriers on communication.
Short Lead Time for Dual Fuel Generators - P625E6A-60HZ – AGG Power - AGG Power Technology (UK) CO., LTD. By Marjorie from Mongolia - 2017.05.02 18:28
We feel easy to cooperate with this company, the supplier is very responsible, thanks.There will be more in-depth cooperation.
Short Lead Time for Dual Fuel Generators - P625E6A-60HZ – AGG Power - AGG Power Technology (UK) CO., LTD. By Eileen from Libya - 2018.06.12 16:22

Leave Your Message

Leave Your Message